Understand About Pipeline Survey
During the pre-construction planning, project owners must obtain bids from qualified pipeline contractors. In addition, selected contractors must obtain proper permits, insurance, and easement rights before breaking ground. The construction phase is divided into three stages. The first involves clearing and grading the land and digging trenches. The second encompasses stringing and welding pipes, then installing the connected pipes into trenches. The final phase involves testing the pipeline, backfilling trenches, and restoring the land to its original condition. Pipeline companies use the method of subsurface utility engineering to locate the position and depth of previously installed pipes and utilities. Determining the location of existing pipelines helps contractors avoid project delays, minimize construction costs, and provide a safer work environment. Pipeline surveys Alberta provide a right-of-way for trenching procedures. Segments of pipe are shipped to the site via...